The portal about the repair of the bathroom. Useful advice

The track of bricks. How to make a brick path with your own hands? How to make a track of brick crumb

The track in the garden and at the cottage - the attribute is trivial. Of course, we wish to step along a comfortable and beautiful path that I got cheaper. Why not choose a brick? Let's make the last doubts together and see how to make the tracks, including the old material.

Harmony finishing the porch and track

Why do we choose brick tracks

Of course, garden tracks from brick attract us durability, accessibility, appearance and simplicity of installation. At the same time, the brick enters direct competition with a paving and concrete.

Another case, if the brick remained from construction and it is convenient to use it for paths in the garden. The third option when there is a desire to equip the tracks in the country of cheaper, and there is an old and broken brick.

The best choice is clinker or paving brick. Such a material looks presentable and serves a long time. Ceramic masonry brick has pores and collapsed under the influence of moisture and frost. However, he can serve a lot with proper preparation of the foundation and special processing. Silicate brick should be considered as a material for the organization of temporary coatings.

Various options for laying

The method of laying bricks defines both design and durability of the track. It must be selected before the start of work, otherwise it is impossible to calculate the amount and range of material. We offer to familiarize several photos to cover the possible options for laying.


Bends and steps on brick tracks

Installation of ligation bricks (bricks are laid with a displacement in neighboring rows) can be guided both along and across the track. Interesting drawing from laid pairs of bricks. The border of the flooring is better to perform a brick exhibited on the edge. Steps on the track make with the installation of bricks on the end.


Brick coating patterns

Brick can be plagged and on the side. In the latter case, it is more difficult to work, the material will be required twice as much, but the track is just longer. Laying "braid" and "Christmas tree" can be performed at an angle of 45 or 90 degrees to the curb. All options can be decorated using material of different shades.

Marking and preparation of the foundation

Starting a brick garden track, you need to stock up as follows:
Additionally, the main material will be required:

  • sand;
  • crushed stone or gravel;
  • geecan;
  • boards width 20-25cm;
  • wooden pegs.

Starting the construction of tracks in the courtyard with their own hands, you should decide on their size and placement. Practice shows that the width of 0.8-1m is sufficient in the garden and in the country. It should not be located closer than 1M from trees, whose root system can disrupt the coating.


Brick track laying scheme

The tracks of the track is convenient to be placed by pegs and a cord or squeeze sand. The groove rotate the depth of 20-25 cm. The bottom of the trench is aligned, trambed and produce the preparation of the base in accordance with the shown scheme:

  1. Pulling the alignment layer of sand with a thickness of 20mm, which is covered with geotextiles. Geekanny will miss the water from the upper layers and will not give a grinding rubble with the soil.
  2. Install the side of the board, which is fixed with nails to the crawls clogged into the ground. The top end of the board coincides with the ground level. The distance between the boards is calculated, based on the planned number of elements in the width of the track, taking into account the borders and the gaps of 2-3mm. It is advisable to install guides on different sides of the track with a difference in an altitude of 10-15mm to ensure that water is removed from the coating.
  3. Put, trambed and leveled a layer of rubble thick about 70mm.
  4. On top of the rubble, the sand is covered with a thickness of 20mm and cover it with geocal. Sand lines crushed stone, and geotextiles will not rush.
  5. Fall asleep, tram and align the mixture of cement and sand in a ratio of 1: 5, thicker of about 50mm.

It is possible to simplify the process of preparation with some reduction in the quality of the base under the track. In this case, both aligning layers of sand with a thickness of 20mm and a medium geotextile sheet can be excluded. Instead of a mixture of sand and cement put sand, which moisturizes and trambet. Crushed stone is possible to replace gravel.

Brick Stacking Guide


Brick track paving stages

Ordinary brick is useful to protect against destruction, immersing it before paving the track into the hydrophobic solution. In this case, it makes sense to re-process the garden path with a hydrophobizer every 4-6 years. As a result of processing, the material does not absorb moisture and becomes frosty. The laying of the coating starts from the installation of the border. The brick is put on the edge along the board and clogs in the sand with a rubber hammer to the top of the guide.

Bricks are consistently stacked in accordance with the planned pattern and clogged into the substrate in the Cyonya. There are 2-4mm gap between adjacent elements. The laying plane is controlled by the level and rule. After mounting the coating of the seams between the bricks, the cement and sand mixture in the 1: 5 ratio with a brush or broom is filled with a brush or broom. The procedure is repeated and after the start of operation of the track in order to fully fill all gaps. Upon completion of the coating, the coating is pulled out. The emptiness formed is filled with cement mortar or soil, which must be sealing.

Paving track from old and broken brick


Mature options from battle

By and large, the laying of the old brick is no different from the installation of new and beautiful. However, the observance of the entire process will be reduced to preserve the cast material. At the same time, it will still have to dug a groove with a depth of 10 cm and fall asleep with its sand on 5 cm. This will allow you to lay out a smooth cloth and take a little moisture. The board exhibited on the edge will help make the edge of the tracks even.


Original patterns of unsuccessful bricks

Note that the use of the battle can be neat and original. For example, a border of the track can be postned by the brick, put on the edge at an angle of 45 degrees. Even more efficiently organize from the whole and broken brick pattern.

Photo examples for imitation


Possible combinations of brick and stone coating

Starting any business, it is always useful to appreciate how others did. From the above examples, it is clearly follows the logicality of the combination of bricks with a stone. The border bears the greatest load and therefore it is reasonable to use more durable natural material in this capacity.


Colorful plates with brick coating

These frames emphasize the potential of bricks during the paving large sites. In this case, various variations of the shape and color of the coating are possible. The main thing is that the selected decision successfully fits into the surrounding landscape.

In conclusion, add that, regardless of which material you work, effort and perseverance will bring the required result. Let you all succeed, and we offer to help a small video.

samodelino.ru.

How to make a brick path with your own hands?

It is impossible to imagine the arrangement of the household territory near the private house without a convenient approach to a residential building, a garage and economic buildings, as well as, of course, without beautiful pedestrian walkways in the garden.

This question can be easily solved using such a common material as a brick. It is attractive as a paving coating by the fact that the tracks from the brick can be made with their own hands and at the same time use those remnants that were not previously spent during construction.

Benefits, disadvantages and types used

The main advantages of the use of bricks for paving pedestrian tracks are simplicity of laying, availability and possibility of using residues after the construction of the house, including broken fragments.

However, the pavement surface covered with wall outdoor wall material is not distinguished by durability. Already in two or three years under the influence of moisture and frost, ordinary brick can collapse. To avoid this, you can recommend:

  • treat stones with a hydrophobizer or moistureproof varnish;
  • use a special clinker brick;
  • buy imitating paving slabs.

Treatment of ordinary clay brick with hydrophobic composition should be carried out at least two times with its full immersion in the liquid. This will ensure the stability of the brick to the effects of moisture and increase its frost resistance.

At the same time, it is necessary to take into account that the validity of the hydrophobizer is no more than five years. After this, the surface of the track must be processed again. The service life of the lacquer coating is determined by the intensity of the operation of the brick path.


Scheme of a brick track.

Clinker brick is practically moisture and therefore almost not destroyed over time. It is more expensive than ordinary, but the garden track from it will be distinguished by durability and more beautiful views.

The carpet of bricks can be posted as:

  • longitudinal pattern with classic spoonful dressing;
  • alternations of vertical and horizontal series;
  • "Christmas trees" at an angle of 45 ° or 90 °;
  • single or double "braid".
See also: Laying rubber tracks in the country

There are also more complex patterns, but for the laying with their own hands it is recommended to use these.


Methods of paving.

Necessary materials and tools

In addition to bricks, for the track device you will need sand, a crushed stone of the middle fraction, Cement PC400 and geotextile - nonwoven waterproofing material.

Tool for work:

  • bayonet and soviet shovel;
  • manual tamping or tamping machine;
  • capacity for kneading the solution and preparation of cement-sand mixture;
  • measuring Roulette 5-10 m;
  • marking cord;
  • pegs;
  • rubber and ordinary hammer;
  • construction workman.

For masonry track from broken brick, you may need an angular grinder (Bulgarian) with a diamond circle for processing uneven edges.

Marking


Marking and garbage excavation.

To perform the marking of future tracks and platforms, use spicy, cord and tape measure. They should take place at least two meters from the trees, since growing roots can lead to the destruction of the base. The garden track should be so width so that two people can dispense with it without covering the coating.

The cord on the carriages should not be strongly saved. To do this, the distance between them do no more than 5 meters. Turns are recommended to do smooth so that the car or trolley can turn them. In places of turns, the number of pegs increase.

Preparation of the foundation and installation of border


Laying geotextile.

To improve the basics of the garden track from bricks, it is necessary to remove 20-25 cm surface soil in accordance with the markup. The bottom of the resulting trench pour the sand layer with a thickness of 2-3 cm and well tumped. After that, the geotextiles across the width and length of the track. This will make it possible to effectively dignify down, not allowing its admission to the base. In addition, the nonwoven canvas will exclude the growth of weed plants through the basis and brick coating.

Flip the sand layer with a thickness of 2-3 cm on top of geotextile, and 10 cm rubble on it and sink well. The sand is necessary so that the sharp edges of the stones do not break the cloth. The rubble layer will perform the role of drainage for removing the incoming moisture and prevents the arrangement of the base of the track.

Read also: Characteristics and laying of road plates
An option using a sandy base.

The drainage layer must be sprinkled with sand, lean the crushed stone and put another layer of geotextile on it. At the edges of the track, install a curb, which can be concrete, plastic or made of bricks laid on the edge. The fastening of border material is performed with its own hands using a cement solution or stakes stabbed from steel reinforcement.

Next, on the geotextile canvas, put a sand or dry cement-sandy mixture. Surface is well sinking and align using a plastering rule or flat wooden bar, taking into account the flow of water from the surface after masonry. Dry cement-sand mixture provides increased strength and coating stability. With small loads on the sidewalk, you can use the basis of their pure river sand.

Laying bricks

The ceiling of the garden track is performed in accordance with the pre-selected pattern.


The stones are put on a sandy or cement-sand surface, slightly rushing them with a rubber hammer for landing into place.

The identified elements need to be removed and squeeze under them a little sand or mixture. The slopes for water removal are tested by the construction level, and a flat surface with plastering rule or wooden bar. If the bar is used, then alignment can be made easy tapping on it.


After laying the brick, a slightly dry cement-sand mixture is poured onto its surface, and then the brush is labeled for filling the seams and spill the surface with water.

After 2-3 days, after the cement in the seams grab, this procedure must be repeated.

Finally

Brick garden track is an affordable solution for landscaping with their own hands. However, the usual wall brick requires pre-treatment with hydrophobic materials, which will provide its protection against the destructive impact of moisture and frost. If you use clinker brick, the pre-processing of the material is not required.

It is very important to correctly make the base of the track - with the device of the drainage layer and laying geotextiles. In addition, all layers of base should be well tumped to further, during operation, the drawdown and the destruction of the surface are not formed.

protrotuarnujuplitku.ru.

Garden tracks from brick: 55 photos

Do you want your garden to not tired gaze boring rectangles? In your dreams, the plot in the country looks harmonious and attractive?

We will tell a few tricks of landscape design, as ordinary garden tracks, using optical laws and rules of the prospects will help make your cottage more beautiful.
Long gardening tracks from bricks will not be boring and sad if they cross the transverse lines. It can be wooden or concrete bars, a brickwork in a perpendicular direction. The same result gives a combination of plates and brickwork.

If the brick path expands near the porch of the house, then it seems shorter if it is narrowed - longer. Garden track, expanding near the porch, creates the effect of the front site in front of the house. If you want to increase the space of the country area, make tracks on the cottage with a smooth bend. So even the smallest yard will look very impressive.
The correct forms in landscape design are such as circles and squares, visually strongly reduce the space. So try to avoid the right forms for garden tracks and sites, if you have a small garden plot.

You can choose any fashionable design for a walkway in the garden or platform in front of the house, but you must take into account two important points - harmony with the main structure and functionality. Pedestrian tracks can be narrower, but not less than meter, and do not require a massive expensive cushion from gravel and sand. If the site in front of the house is used by you as an access, it should have a reliable foundation, otherwise the brickwork can turn and crack. For paving the brick of the garden path there are several options. In any case, the pillow is preparing first: along the track contour, pegs with a cord are driven, the ground is removed, 10-15 cm rubble are removed, rubble is compacted, 3-5 cm of sand is poured on top of which brick. The seams between the brick are filled with wet sand, after that the surface of the track is spilled and falling asleep with dry sand. At the end, the sand surplus is washed off with water.
Very beautiful garden paths are obtained from a combination of bricks and natural stone. In this embodiment, the laying is carried out on a skinny concrete. For such a track, you need to make 1-3% bias away from the building, because Seams in this track will not be able to absorb and direct excess moisture. When laying on a prepared gravel-sand pillow, a layer of wet concrete is poured, brick and stoves are stacked, the laying is watering with water. After that, all seams on the track are tightly sealed with a special solution.

However, in the method of laying a garden track to concrete there is a catch: some natural stones react with concrete and over time are covered with inaccurate divorces. Therefore, with such a choice, you must need consultation with a specialist in natural materials. Special clinker bricks for the packing of garden tracks have a beautiful natural hue and allow you to use not only the front side of the brick, but also the side, creating a spaciousness for fantasy: it is a pavement of a spiral, squares, beautiful roundings.
The combination of reliable concrete slabs and brick softens the design of the track, making it more harmonious and cozy.

Do you prefer a concise design or strive to use modern landscape design trends, try to avoid boring ordinary solutions for tracks in your garden. After all, garden paths are a diverse, reliable and easy way to give your garden a unique and spectacular look.

idealsad.com.

Brick paths in the country area

For the construction of their own hands on the country, not only special materials intended for paving are often used. The favorite way of improvement of the garden plot is the use of surplus materials remaining from building a house. In particular, wall bricks are often used to create sites and paths.

What types of bricks are suitable for paving

The attractiveness of the idea is to climb the tracks in the country of the brick, due to a number of reasons:

  • such material often remains after the construction is completed, that is, almost "free";
  • modular brick sizes are convenient for carrying and performing work with their own hands without partners;
  • an uninitiated view of a brick fitness seems reliable and durable.

In fact, the strength characteristics of the tracks made from ordinary wall brick varieties leave to be desired. It does not depend on the choice of its variety: silicate or red (no matter, hollow or full-time). The desire to save and make a brick paths can lead to disappointment after the first winter. Under the influence of water and frost, brick blocks are smeared, split into small pieces. The porous structure of the burned brick clay is saturated with moisture and becomes fragile. Therefore, it will be possible to use cheap material only on dry raised areas with good drainage, or completely protected from precipitation.

The easiest way to lad out a brick track:

Many reliable modern materials specifically designed for paving are made in the form that allows you to imitate brickwork:

  1. Laming. Performed by vibrating or vibropressing. High quality and durability has vibropressed blocks. Adding dyes for concrete makes it even more like a brick. Different thickness of products (from 4 to 8 cm) allows you to choose a paving a paving for giving depending on future loads - from the paths between the beds to the parking area.
  2. Clinker brick. High strength and very beautiful material has long been popular in Europe, conquers more and more fans among dacities. Of course, its price is higher than that of the majority of the paving stones and approaching the cost of a natural sawmill stone. But the assortment of clinker allows you to choose the color and texture of the surface that satisfy the most demanding taste. Clinker brick is extremely durable. If you get the diamond circles for the Bulgarian, allowing you to make the necessary cuts, each craftsman will easily lay out the track from the clinker brick on the cottage.

Preparatory work

By occupying on the plan, the location of the track-path network, proceed to its markup. It is convenient to do with pegs and cord. In the course of the breakdown, they determine which way to create a slope of the road canvase for water flow and thawing snow. Sufficient slope parameters - 1-2º for each running meter.

As with most other ways to build tracks in the country with their own hands, in the marked borders you need to dig the pit for the base device. It consists of a tightly rambling layer of rubble (20 cm) and the leveling layer of sand (about 5 cm). Tambrush rubble is carried out by vibrating or manual fixtures. For better sand seal shed water.

Using a smooth board or the construction rule, smash the sand surface, not forgetting about the slope. The laying of bricks lead either on the sand, or on a dry cement-sand mix in the proportion of 1: 4.

The device of borders and laying bricks during the construction of the track

Since the size of the brick module is small (as a rule, 10x20 cm), without installing the limiters along the edges of the track, it may not resist in the designated boundaries and sprawling. It can happen when laying, and subsequently. So that this does not happen, use ready-made pavement borders. With their absence, the role of limiters perform bricks put on the edge and fixed with mortar.


Bordeur of bricks fixes on the boundary of the track with a solution

In the process of independent construction, the tracks also use temporary borders from durable boards, which are then removed. A good rammed base and neatly and accurate borders will serve as a guarantee of the reliability of the brick pavement performed by their own hands.

Getting Started, it is starting to jull to lay bricks on sand or a dry cement-sandy mixture and punch them with the Cyan. The horizon is aligned by manual bubble level. The laid rows are more densely bother with each other, hitting the blackboard on the side of the board applied on the side.

Selection of paving patterns

Depending on the overall design and style landscape design, various types of brickwork are used:

  • straight, with a shift of rows;
  • diagonal;
  • parquet;
  • circular;
  • scaly (Venetian masonry) and their numerous varieties.

An example of a straight masonry with a shear to the Polkirpich


Parquet masonry

Additional effects create ornaments of several colors or selection of brick shades with different firing intensity.

The final stage of creating a brick path. Bug fixes and repair

After the masonry is completed, it is necessary to fill the slots between the bricks. Most often, ordinary sand is used for this, since the cement-sandy mixture can leave ugly whitewater divorces on the surface. A layer of pure sashed sand is poured onto the track and remove it into the slot using the brush. The operation is repeated several times, alternating with a hose strait.


Filling with sand slots

After winter, defects may appear on the track surface: drawdowns, dupile, destroyed or sprinkled on the side of bricks. You can proceed to their correction with your own hands, waiting for the soil. The coating from the defective area is removed and level the base. Then the pavement is then restored.


Alpine slide for giving with their own hands

Your attention is offered a construction guide brick tracklocation on. If you have a private house, a good large plot under the garden, but walking on the grass, pulling out the paths, or even worse on the mud. You can easily post a sidewalk of bricks, no worse than professionals using our guide.


What will our track will consist of which layers should be

As you can see, the sidewalk will be recessed from the first drawing to the ground, there will be a layer of gravel or crushed stone, then the sand is on top and above the brick. About everything in order.

Drop the trench

Determine the desired width of your track and add 5 cm. Approximately determine the location of the track, hose or paint. Using the shovel between the markup, remove the top layer of the soil. Copy until you see the change in the soil color (as shown in the figure). The top layer of the soil fold on the tarpaulin so that, thereby not polluting the site.

Fill trench crushed stone, gravel

Fill 2.5-5 cm rubble or gravel (as shown in the figure). Water gravel to wash off dust.

Tumble and fill

Turn the layer, watering water, then pour gravel or 2.5-5 cm crushed stone again, tamper. You should have a 10 cm layer of gravel.

Add a layer of sand

Now it is necessary to install side guides and pour the sand layer. Make the same outstanding tool as in the drawing and level the sand.

Put the brick edging

Put the brick on the edge into the trench. Drink bricks with a special hammer, so that the brick surface is at the top of the guide (as shown in the figure). For accuracy, check the surface level. Route edging along the guides.

Fill the space brick

Start laying bricks. Breaking bricks on the sidewalk, a large number. We offer this option. Stop it by checking the surface of the masonry surface. And leave small sand holes.


Filling seams

Shovel Apply a thin layer of sand over bricks. Using a large broom, notice the sand in the seams between the bricks (as shown in the figure). Then you need to pour the surface of bricks with water so that the sand has seal. Then repeat the falling asleep between the bricks.

Let all this stand out for one week and if you add, as needed, in the seams of sand. After another week, remove all inserts and guides.

If you did everything in our instruction, you should get this Brick path.

With the competent use of the material and compliance with the laying technology, the path of the broken brick is able to serve not only as a functional element of the country exterior. A neatly paved path from the cast products allows you to effectively emphasize the style of the garden complex and improve the visual perception of space.

The key advantages of the application of the challenge construction trainers are considered:

  • simplicity of laying. For the paving garden sidewalks and paths from brick fragments, only basic knowledge of working with material and a simple set of tools are required;
  • availability of products. The rolling resource saves a considerable amount on the preparation of materials;
  • the possibility of disposal of construction waste with a significant budget benefit. That is, there is no need to export broken remnants of products to clear the territory.

Among the disadvantages of using residues of building materials, there is a need for additional processing to extend the service life. Moreover, this does not concern the clinker brick, which is characterized by high performance characteristics.

Brick battle - Excellent material for the arrangement of garden tracks

How to use broken brick

Planning how to use broken bricks at the cottage, homemade craftsmen find interesting solutions such as:

  • putting beautiful garden sidewalks;
  • creating borders;
  • registration of flower and high beds.

Also, when solving the issue, how to use broken bricks, recommend to use secondary material when building gabions and arrangement of the bases for the Alpine slides. Most gardeners are fond of the design of high vegetable beds, the design of which provides for the formation of a powerful drainage layer, where you can also effectively use single-caliber combat fragments. With the help of the cut products, it is easy to build high-quality drainage when planting trees and shrubs.

According to experienced tiles, the use of unsightly material can give quite original fruits. For example, a border of the track can be arranged from the product that is unsuitable for the construction of the product, exposing specimens on the edge at an angle of 45 °. To get a unique masterpiece in the form of a garden path with the original pattern of masonry, you can organize a composition from battle and a whole brick.

How to make a path from a broken brick: stages of work

In order for the final result to be delighted with decent decorative and functional characteristics, the technology of paving garden paths should be adhered to.


Planning

When planning a track of a brick, the following points take into account with your own hands:

  • the width of the path is chosen so that two people can pass freely;
  • the distance between the accommodated object and trees is at least 2 meters, otherwise the growing roots of plantations over time can lead to the destruction of the base of the structure.

Tools and materials

During the construction of a garden path, the following tools and accessories will be needed:

  • roulette, pegs and cord for marking;
  • shovel - bayonet and soviet;
  • timing tool;
  • the hammer is rubber and ordinary;
  • rule, trowel, brush;
  • capacity for the preparation of the solution.

For the processing of uneven edges, the broken products will need a Bulgarian with a diamond disk.


In addition to the main building material, you should take care of availability:

  • sand and rubble of the middle fraction;
  • portland cement brand 400;
  • geotextile.

It is also worth having a garden wheelbarrow at hand to move materials, a hose for final surface treatment with water.


Preparation of the foundation

Solving how to make a road from a broken brick during the organization of the country landscape, perform the following algorithm for the preparation of the foundation:

  • on the markup line it is necessary to remove the upper ground in a depth of 20-25 cm;
  • the trench is sprinkled with an aligning layer of sand 2-3 cm thick and tamper;
  • the entire surface of the trench is made up with geotextiles;
  • nonwoven canvas fall asleep with a layer of sand 2-3 cm;
  • the following is a drainage layer of rubble with a thickness of 10 cm;
  • next, the drainage falls asleep with sand and laid the second layer of geotextiles.

It should be borne in mind that the sand layer between geotextiles and rubble helps to prevent the strain of the canvas with waterproofing with sharp edges of the pebbles.

Formation of border

The perimeter of the trench is drawn up by a border. Here you can use a concrete solution or plastic products. Also relevant to apply a brick border, putting it on the edge. Fastening of border design is performed in different ways: with the help of cement mortar, steel reinforcement elements or other convenient means. After the formation of a border on geotextile, a dry cement-sandy mixture falls asleep and align the composition using a rule, taking into account the water drain from the surface.


Laying bricks

When paving the garden path, one of the simple masonry options are used, including:

  • classic belt bandage in the form of a longitudinal pattern;
  • pattern "Christmas tree" at different angles;
  • "Braided" single or steam room;
  • alternation of horizontal lines with vertical.

The broken brick for the selected pattern is placed on a prepared cement-sand surface:

  • when laying, the stones are inserted with a rubber hammer for better landing;
  • the requested specimens are required to lift, beding sand under them;
  • after laying the material on the surface, a little cement-sand mixture poured;
  • next, using the brush, the composition for filling the seams is labeled.

At the end of the installation work, the surface is spilled by water to seal and set the seams.

Final processing

Latest installation points, including filling of seams by cement-sand composition and water procedures, must be repeated after 2-3 days, when the cement grabs well.

Practical tips for the long-term use of a garden track of a broken brick:

  • so that the surface of the sidewalk is not deformed under the influence of moisture and temperature drops, the stones are treated with a hydrophobizer or moistureproof varnish;
  • if the clay brick is used, the material is 2 times before assembly, the material is treated with a hydrophobic composition of the method of full immersion of the product into liquid and drying;
  • the validity of the hydrophobic agents is 5 years, after this period of time the surface of the sidewalk is needed. The service life of the object also affects the level of intensity of operation.

The potential of the broken brick, especially if the material is used in different color solutions, allows you to create interesting compositions, which is confirmed in the work of the masters.

Old brick dacha will always come in handy. The maintenance of private economy is a rather complicated and responsible process aimed at constant care for buildings and maintaining their appearance. However, this work has many advantages to equip the site based on personal preferences and their own wishes. For the implementation of similar projects, a variety of materials and remedies available can be applied. Old brick is one of these products that are almost always available and can be recycled to build various objects.

The old brick, which remained after disassembling the stove or walls of the house, can be useful for refining a country area.

Using the old brick: the construction of a garden path with their own hands

To create a garden track, you can do the material of secondary use, which is almost always in the country area. Disassembling the old barn, the construction of a wave or repair of the house inevitably leave behind a lot of surplus, which can come in handy for the construction of garden tracks.

The main material of such structures serve as brick residues. Also, the garden track may include other challenging materials left after construction or disassembly of any object. It is easy to create this system with your own hands, and the result of the work will be a magnificent coating that can not only ensure the practicality of movement on the site, but become an decoration.

How to post a brick path? The procedure for creating such an object is a time-consuming and responsible containing many nuances. However, with the knowledge of the case and the skillful handling of the tool, the creation of a track in the country will take a little time. The brick pavement is manufactured in such steps:

  • drawing up a construction plan;
  • marking of the site;
  • collecting tools;
  • preparation of the foundation;
  • formation of a border;
  • laying brick;
  • finish processing.

Tracks in the country, made of old bricks, must be performed according to the above scheme. This can only be guaranteed to obtain a durable and durable coating capable of becoming a dacha decoration and to serve for long years.

Preparatory work and tool collection

The country's country paths are performed on the basis of a construction plan containing a drawing of the future object and its technical characteristics.

At the same time, the plan has tremendous importance, since it is a visual mapping of the construction, which before that existed only in thoughts. Having created a detailed drawing, a person represents how such a sidewalk will look, and understands the feasibility of building on a particular site.

The next stage after drawing up the construction plan is marked by terrain. As a rule, it is performed using wooden columns and ropes connecting them between themselves. The delimitation of the garden plot makes it possible to see the contours of the future track of the brick, all its bends and turns.


As soon as the preparatory work is over, and the future garden tracks from the brick have found the form with the help of ropes and columns, you can proceed to the inventory collection.

This process is extremely important because it makes it possible to significantly accelerate and simplify work. Make a red brick track will help the next set of tools:

  • roulette;
  • pencil;
  • hacksaw;
  • rubber hammer;
  • shovel;
  • bucket.

The formation of a dacha sidewalk of brick and its finishing finish

What can be done with secondary raw materials? Can alone to build a border of bricks for flower beds.


The brick paths for the cottage are one of the most successful and bright objects in which the use of the cast material is almost imperceptible.

//www.youtube.com/watch?v\u003djepvrucfzqe.

The next step is made by the base on which the brick surface will be laid. With the help of the shovel, it is necessary to dug a hole with a depth of 1 m throughout the area of \u200b\u200bthe path. After that, at its bottom, a cushion is formed from gravel, designed to ensure the removal of water from the surface. The crushed stone is poured and lines the sand layer that shakes the base for laying brick blocks.

According to the contour of the future track made of red brick, a wooden board is stacked, which plays the role of the border. Its purpose conditionally, because after completing the work, it should be removed. However, in the process of construction, it is simply indispensable because it helps to obtain an even plane.

Directly near it is placed bordered brick, which is stacked on the end. This placement will allow the path in the country not to break up and keep the form.

//www.youtube.com/watch?v\u003dlnl1xe7qdsq

Between two borders, the blocks themselves are stacked with the help of a rubber hammer. In this case, each of them is set to the other in such a way that the gaps between them were minimal. Their elimination and formation of the monolithic surface is carried out using a rubber hammer. At the end of the finished plane of the red brick, the sand layer is poured, designed to fill the slots and the final track composition.

For the construction of their own hands on the country, not only special materials intended for paving are often used. The favorite way of improvement of the garden plot is the use of surplus materials remaining from building a house. In particular, wall bricks are often used to create sites and paths.

What types of bricks are suitable for paving

The attractiveness of the idea is to climb the tracks in the country of the brick, due to a number of reasons:

  • such material often remains after the construction is completed, that is, almost "free";
  • modular brick sizes are convenient for carrying and performing work with their own hands without partners;
  • an uninitiated view of a brick fitness seems reliable and durable.

In fact, the strength characteristics of the tracks made from ordinary wall brick varieties leave to be desired. It does not depend on the choice of its variety: silicate or red (no matter, hollow or full-time). The desire to save and make a brick paths can lead to disappointment after the first winter. Under the influence of water and frost, brick blocks are smeared, split into small pieces. The porous structure of the burned brick clay is saturated with moisture and becomes fragile. Therefore, it will be possible to use cheap material only on dry raised areas with good drainage, or completely protected from precipitation.

The easiest way to lad out a brick track:

Many reliable modern materials specifically designed for paving are made in the form that allows you to imitate brickwork:

  1. Laming. Performed by vibrating or vibropressing. High quality and durability has vibropressed blocks. Adding dyes for concrete makes it even more like a brick. Different thickness of products (from 4 to 8 cm) allows you to choose a paving a paving for giving depending on future loads - from the paths between the beds to the parking area.
  2. Clinker brick. High strength and very beautiful material has long been popular in Europe, conquers more and more fans among dacities. Of course, its price is higher than that of the majority of the paving stones and approaching the cost of a natural sawmill stone. But the assortment of clinker allows you to choose the color and texture of the surface that satisfy the most demanding taste. Clinker brick is extremely durable. If you get the diamond circles for the Bulgarian, allowing you to make the necessary cuts, each craftsman will easily lay out the track from the clinker brick on the cottage.

Preparatory work

By occupying on the plan, the location of the track-path network, proceed to its markup. It is convenient to do with pegs and cord. In the course of the breakdown, they determine which way to create a slope of the road canvase for water flow and thawing snow. Sufficient slope parameters - 1-2º for each running meter.

As with most other ways to build tracks in the country with their own hands, in the marked borders you need to dig the pit for the base device. It consists of a tightly rambling layer of rubble (20 cm) and the leveling layer of sand (about 5 cm). Tambrush rubble is carried out by vibrating or manual fixtures. For better sand seal shed water.

Using a smooth board or the construction rule, smash the sand surface, not forgetting about the slope. The laying of bricks lead either on the sand, or on a dry cement-sand mix in the proportion of 1: 4.

The device of borders and laying bricks during the construction of the track

Since the size of the brick module is small (as a rule, 10x20 cm), without installing the limiters along the edges of the track, it may not resist in the designated boundaries and sprawling. It can happen when laying, and subsequently. So that this does not happen, use ready-made pavement borders. With their absence, the role of limiters perform bricks put on the edge and fixed with mortar.

Bordeur of bricks fixes on the boundary of the track with a solution

In the process of independent construction, the tracks also use temporary borders from durable boards, which are then removed. A good rammed base and neatly and accurate borders will serve as a guarantee of the reliability of the brick pavement performed by their own hands.

Getting Started, it is starting to jull to lay bricks on sand or a dry cement-sandy mixture and punch them with the Cyan. The horizon is aligned by manual bubble level. The laid rows are more densely bother with each other, hitting the blackboard on the side of the board applied on the side.

Selection of paving patterns

Depending on the overall design and style landscape design, various types of brickwork are used:

  • straight, with a shift of rows;
  • diagonal;
  • parquet;
  • circular;
  • scaly (Venetian masonry) and their numerous varieties.

An example of a straight masonry with a shear to the Polkirpich

Additional effects create ornaments of several colors or selection of brick shades with different firing intensity.

The final stage of creating a brick path. Bug fixes and repair

After the masonry is completed, it is necessary to fill the slots between the bricks. Most often, ordinary sand is used for this, since the cement-sandy mixture can leave ugly whitewater divorces on the surface. A layer of pure sashed sand is poured onto the track and remove it into the slot using the brush. The operation is repeated several times, alternating with a hose strait.

Filling with sand slots

After winter, defects may appear on the track surface: drawdowns, dupile, destroyed or sprinkled on the side of bricks. You can proceed to their correction with your own hands, waiting for the soil. The coating from the defective area is removed and level the base. Then the pavement is then restored.

Clinker paving. Spectacularly selected shades of terracotta of varying degrees