Norms and regulations of snips and gost in the construction of a private house. Norms and regulations of snips and gost in the construction of a private house Current building codes and regulations

SNiP - stands for: “ Building regulations", which includes regulatory documents in the field of construction, adopted by the executive authorities.

Typically, building codes are in 4 parts:

  • general provisions;
  • design standards;
  • rules of production and acceptance of works;
  • estimated norms and rules.

GOST - a regional standard adopted by the Interstate Council for Standardization, Metrology and Certification of the Commonwealth of Independent States.

In this section, we have collected the current SNiPs and GOSTs for the design and construction industry, which we are guided by, which you can also download for review or print.

GOST R 51872-2002 "EXECUTIVE GEODETIC DOCUMENTATION. RULES FOR IMPLEMENTATION "was developed by the Central Scientific Research and Design and Experimental Institute for Organization, Mechanization and Technical Assistance to Construction (FV Andreeva) with the participation of ...

SP 42.13330.2011 “URBAN PLANNING. PLANNING AND DEVELOPMENT OF URBAN AND RURAL SETTLEMENTS ". Developed by the team of authors: theme leader - P.N. Davidenko, Cand. architect., corresponding member RAASN; L. Ya. Herzberg, Dr. sciences, corr. RAASN; B.V. Cherepanov, ...

SNiP 11-02-96 “Engineering surveys for construction. Basic provisions ". SP (Code of Rules) dated October 29, 1996 No. 47.13330.2010 SNiP dated October 29, 1996 No. 11-02-96. Information about the set of rules DEVELOPED by the Production and Research ...

CODE OF RULES "ENGINEERING AND GEODETIC SURVEYS FOR CONSTRUCTION". Date of introduction 1998-01-01. DEVELOPED by the Industrial and Scientific Research Institute for Engineering Surveys in Construction (PNIIIS) of the Gosstroy of Russia, GO "Rosstroyiziskaniya", ...

SP 47.13330.2012 “Engineering surveys for construction. Basic provisions. " CODE OF RULES ENGINEERING SURVEY FOR CONSTRUCTION. MAIN PROVISIONS Date of introduction 2013-07-01 DEVELOPED BY NOIZ (L.G. Kushnir, Candidate of Geological and Mineralogical Sciences B.S. Sokolov, ...

The construction of a private house, as well as its design, carried out in accordance with the requirements of the regulatory normative and technical documentation, is the largest resource for saving costs!

Because, firstly, by observing the standards and technical regulations, you reduce to a minimum the possibility of making construction mistakes, the correction of which always amounts to many thousands of rubles. Secondly, a lot of defects committed during the construction of a house can only be detected during its operation. Alterations of building structures during residence, deliver the greatest inconvenience and force you to bear impressive unplanned costs. For example: a damp wall, a leaking roof, overheating electrical wiring, an ice floor, etc.

If you want to achieve a swing of savings, then you need to competently monitor the progress of construction work. To do this, you need to know the key control points and quality assessment criteria. In this section, a short selection of the main regulatory documents necessary for the design and construction of a private house is made.

1. Design, preparation for building a house

1.1. Architectural, general construction standards.

First, you should familiarize yourself with the Code of Design Rules for SP 11-III-99. After reading this document, you will definitely know what papers are required to start construction on your individual site. During the construction of a residential building and various outbuildings, there are norms for their location on the site, according to the following documents:
- "Urban Planning Code of the Russian Federation" dated December 29, 2004 N 190-FZ;
- "Planning and development of gardening associations of citizens, buildings and structures" SNiP 30-02-97;
- "Residential buildings" SNiP 2.08.01-89 * and SP II 106-97;
- "Single-family residential houses" SNiP 31-02-2001;
- “Urban planning. Planning and development of urban and rural settlements "SNiP 2.07.01-89;


This is the approximate layout of buildings on the site according to RSN 70-88.

Having carefully studied RSN 70-88 (republican building codes), SNiP 31-02-2001 and SNiP 2.08.01-89 (Building Norms and Rules), you will find out what are the restrictions on the areas and heights of the premises of a residential building.

There are minimum restrictions on the height of the floors (SNiP 2.08.01-89). A house may be deemed unfit for permanent residence if the height of the residential floors is lower than 2.5 m from floor to ceiling. In the attic floor, the height norm is from 2.3 m. The number of storeys of a house is usually determined by the above-ground floors, which includes the attic floor. It is not allowed to place living rooms in the basement or basement floor. The basement floor can be equated to the above-ground floors if the top of its floor is at least 2 meters above the ground level. If it is decided to place utility rooms in the basement or basement, then the height from floor to ceiling should be at least 2 meters.

The area of \u200b\u200ba residential building is defined as the sum of the areas of all premises of the floors. Balconies and loggias are also included in the total area. The areas of staircases at the level of a given floor are considered.

If you plan to build a house on the territory of a gardening partnership, then you must take into account the requirements of SNiP 30-02-97 "Planning and development of gardening associations of citizens, buildings and structures" in the 2011 edition.

1.2. Concrete structures.

1.3. Heat engineering standards. Resistance to heat transfer of enclosing structures.

1.4. Engineering Communication.



Electric wires from the street pole to the entrance to the residential building must run at a height of at least 2.75 m from the ground. If the diversion is carried out on the other side of the street along which the vehicles are moving, then the permitted height is 6m. The length of the branch from the main line to the residential building should not exceed 25 m, if more is obtained, an additional support is installed. All points of contact of the cable with the surface of the building, and passing through the walls, must be fireproof and reliably insulated, and at the points of entry, the outer end of the insulating pipe must point downward to avoid atmospheric precipitation.

If the rules for the installation of sewer networks are violated, the developer is threatened with their regular clogging. It is doomed to frequent cleaning of pipes clogged with drains. According to the standards, the daily sewage costs per person are about 200 liters. The smallest diameter of the external sewer pipe should be 100 mm, with a slope to the general collector of at least 8%. The smallest pipe burial depth is 0.3 meters. If there is no centralized street sewage system, then it is allowed to build filter wells and trenches with the obligatory installation of a septic tank in front of them (industrial purification device). The base of the artificial filters should be 1 meter above the water table.

With the appropriate knowledge and experience, it is allowed to independently install engineering networks, with the exception of gas communications. There are very stringent requirements for the acceptance of a gas supply system. Only a specialized organization has the right to install the gas pipeline and connect gas appliances.

Gas pipes can be introduced into a residential building only from the side of the furnace or kitchen. If the house is old and has a heating stove, then it is allowed to enter communications into the living room, provided that a disconnecting device is placed outside the building. Under no circumstances should the gas pipe be introduced into the house through or under the foundation. If the pipe is laid along the outer wall of the house, then its nominal diameter should not exceed 50 mm. It is not allowed to arrange detachable pipeline connections under window openings and balconies. In general, all connections must be welded, threaded connections - only in the places of installation of valves and gas appliances. If, according to the project, the gas pipe passes over footpaths, then it should be fixed at a height of at least 2.2 meters from the ground.

It is impossible to install more than two heating devices in one room. It is strictly forbidden to install a water heater in the bathroom, otherwise you may end up with an excellent gas chamber.

The room for the gas boiler and water heater must be at least 2 meters high. When installing one device, the room has a volume of at least 7.5 cubic meters, and with two devices - at least 13.5 cubic meters.

2. Building a house.

2.1. Foundations and concrete structures

2.1.10. The rest of the necessary information for the construction of the foundation can be found in: SNiP 2.02.01-83; SNiP 31-02; SNiP 2.02.03-85; SNiP 2.02.04-88; SNiP 2.02.01.

2.2. The walls of the house.

2.2.18. GOST 24454-80 - Softwood lumber, GOST 9685-61 - Softwood blanks.

Before proceeding with the construction of a future house, you need to try to fully study the requirements of SNiPs and GOSTs, which regulate the process of erecting structures for individual housing construction. Of course, you will hardly be able to thoroughly study them all, for this you need to be a specialist, but this is not necessary. It is enough to get a general idea of \u200b\u200bthe basic laws governing the entire process of building a house.

Who monitors compliance with the standards for the construction of private houses

Compliance with general construction and special norms and regulations governing the construction of individual households is controlled by various local permitting authorities. The main document that determines the sequence of development and approval of the entire package of construction and design documentation in individual housing construction is the Republican Building Norms RSN 70-88.

It is RSN 70-88 that prescribes the rules for building an individual housing construction site, the layout of your house, the location of utility and technical structures such as a bathhouse, a barn, a cellar, etc.

The planning of the planned house and the entire courtyard must be thought out as carefully as possible already at this stage, since after the approval of the construction plan, any changes in it will be considered a violation of the law and must be corrected, and illegal buildings - demolition or additional legalization.

What documents are needed to build a private house

Based on the "Code of rules for the design and construction of SP 11-III-99", it is possible to clearly determine what documents need to be prepared to start the construction design process.

Quite often, the impatient owners of individual housing construction sites do not wait for the issuance of the entire package of permits in their hands and start construction. Such haste in most cases leads to an additional "headache" for the impatient developer.

The first step towards the beginning of the cherished construction of a house will be to write an application for a building permit, supported by:

  • By the decree of the head of the local administration on providing you with a land plot of individual housing construction or documents confirming the ownership of the plot in case of its acquisition,
  • master plan of the site,
  • plot passport,
  • an act on the natural establishment of its boundaries and the breakdown of buildings, red lines and building axes.

On the basis of the package of documents you have provided, you will be issued a Decree on a building permit and a "Passport for the project of a private residential house" is drawn up, which will include:

  • the decision of the administration on the issuance of a building permit;
  • a document confirming the developer's right to use (own) a land plot;
  • a copy of the relevant urban planning documentation from the master plan;
    situational plan of the IZhS site;
  • technical conditions (TU) for connection to utilities with a diagram;
    floor plans of buildings, facade sections;
  • an act concerning the full-scale establishment of the boundaries of a land plot and a breakdown of buildings (with a layout scheme).

What documents are included in the "Project of an individual private house"

The package of permits "Project of an individual private house" includes:

  • a situational plan on a scale of 1: 500, representing the placement of all construction objects in conjunction with the nearest settlements, infrastructure and communications: electric networks, heat and water supply networks, sewerage networks;
  • printout of topographic photographs of the IZhS section with the adjacent part of the street (M 1: 500);
  • master plan of the site with a vertical layout and linking the construction project to the area (M 1: 200, 1: 1000);
  • basement plan of the house being built (technical underground and basement);
  • floor plans of the house (M 1: 100, 1:50);
  • the main and side facades of the structure (Scale 1:50, 1: 100);
  • characteristic cuts (M 1: 100, 1:50);
  • floor plans and coverings of non-repeating floors (Scale 1: 100);
  • roof rafter system plan (M 1: 100);
  • roof plan (M 1: 100, 1: 200);
  • foundation plan (M 1: 100, 1:50);
  • section of foundations, typical architectural and construction units and details (М 1:10, 1:20);
  • general explanatory note and technical and economic indicators;
  • estimate and financial calculations of the cost of construction;
  • engineering drawings (according to the design assignment).

How far should the house be from other structures

Requirements for the location of buildings on the site in the legal framework are inextricably linked with the concept of "Red Line". The red line is a conventional line passing along the border of the site and the carriageway of the street, as well as the borders of neighboring sites.

According to fire regulations, the distance between residential buildings located in adjacent areas must be at least 6 (brick structures) or 15 (wooden structures) meters.

Fences installed around the site must be indicated in the project, their location should not go beyond the red line established by the plan.

If you plan to breed pets or poultry on your site, it will be useful to inquire about the requirements for the construction and location of facilities for keeping livestock and poultry. For example, the height of a poultry house and barnyard cannot be less than 2.4 meters from the floor (or the ground if the floor is earthen) to the ceiling.

In the same way, there are rules for the location of garden trees and shrubs on the site. The minimum distance from trees to buildings is 5 meters, and to the borders of the neighboring plot is 3 meters. In addition, trees cannot be closer than 4 meters to the supporting supports of electrical networks and closer than 1.5 meters to the laid underground utilities. For shrubs, the maximum permissible planting distances are 1.5 meters from buildings and 1 meter to the boundaries of the site.

Requirements for the height and area of \u200b\u200ban individual residential building under construction

Restrictions on the area of \u200b\u200bthe house being built relate, first of all, to the minimum areas of its living rooms. SNiP 2.08.01-89, RSN 70-88 are responsible for determining these norms.

You will not receive a building permit if you indicate the estimated area of \u200b\u200bthe living room is less than 12 m 2. For a bedroom, this limit is 8m 2, for a kitchen - 6m 2, a toilet - 0.96m 2. Exceptions for the minimum area of \u200b\u200brooms are requirements for attic rooms, here the minimum bedroom area is 7m 2.

The legislation does not provide for the maximum size of premises.

On the basis of SNiP 2.08.01-89, the minimum values \u200b\u200bfor the height of rooms in the house are clearly defined - 2.5 meters, except for attic rooms (2.3 m.). In addition, there are still many requirements for the dimensions of the functional structural elements of a house under construction, for example, the width of staircases and corridors of a house cannot be less than 0.9 meters.

How many floors of the house are you allowed to build

With an individual private house, it is allowed to build no more than 3 above-ground floors. The basement floor is not intended to accommodate living rooms if the height of its upper floor is less than 2 m above ground level. If its height is more than 2 meters above ground level, then such a basement is equated to above-ground floors.

Attention: do not confuse the height of the upper slab above the ground level and the height of the basement itself!

If the basement floor ends at a height below 2 m above ground level, but its height exceeds 2 meters, it can be used for economic and technical purposes. In the case of using a basement floor for a garage, its floors and walls must be made of fireproof materials.

Often, the developer himself cannot accurately calculate the area of \u200b\u200bthe house being built, then it is determined using SNiP 2.08.01-89.

When calculating the total area of \u200b\u200bthe house, errors are possible. It is worth remembering that an overestimated building area will result in additional costs in the future - in an overstatement of real estate tax, excessive utility bills.

It is worth remembering that when determining the total area of \u200b\u200bthe house, the areas of balconies, loggias and stairwells are also summed up. But the area of \u200b\u200bunheated utility rooms, underground and attic is not taken into account.

"SNiP 2.04.12-86 Calculation of the strength of steel pipelines"

  • SP 34. ... "SNiP 2.05.02-85 * Highways"
  • SP 35. ... "SNiP 2.05.03-84 * Bridges and pipes"
  • SP 36. ... "SNiP 2.05.06-85 * Trunk pipelines"
  • SP 37. ... "SNiP 2.05.07-91 * Industrial Transport"
  • SP 38. ... "SNiP 2.06.04-82 * Loads and impacts on hydraulic structures (wave, ice and from ships)"
  • SP 39. ... "SNiP 2.06.05-84 * Dams from soil materials"
  • SP 40. ... "SNiP 2.06.06-85 Concrete and reinforced concrete dams"
  • SP 41. ... "SNiP 2.06.08-87 Concrete and reinforced concrete structures of hydraulic structures"
  • SP 42. ... SNiP 2.07.01-89 * Urban planning. Planning and development of urban and rural settlements "
  • SP 43. ... "SNiP 2.09.03-85 Structures of industrial enterprises"
  • SP 44. ... "SNiP 2.09.04-87 * Administrative and domestic buildings"
  • SP 45. ... "SNiP 3.02.01-87 Earthworks, foundations and foundations"
  • SP 46. ... "SNiP 3.06.04-91 Bridges and pipes"
  • SP 47. ... SNiP 11-02-96 Engineering surveys for construction. Basic provisions "
  • SP 48. ... "SNiP 12-01-2004 Organization of construction"
  • SP 50. ... "SNiP 23-02-2003 Thermal protection of buildings"
  • SP 51. ... "SNiP 23-03-2003 Protection against noise"
  • SP 52. ... "SNiP 23-05-95 * Natural and artificial lighting"
  • SP 53. ... "SNiP 30-02-97 * Planning and development of territories of horticultural (summer cottage) associations of citizens, buildings and structures"
  • SP 54. ... "SNiP 31-01-2003 Residential apartment buildings"
  • SP 55. ... "SNiP 31-02-2001 Single-family residential houses"
  • SP 56. ... "SNiP 31-03-2001 Industrial buildings"
  • SP 57. ... "SNiP 31-04-2001 Warehouse buildings"
  • SP 58. ... SNiP 33-01-2003 Hydraulic structures. Basic provisions "
  • SP 59. ... "SNiP 35-01-2001 Accessibility of buildings and structures for people with limited mobility"
  • SP 60. ... "SNiP 41-01-2003 Heating, ventilation and air conditioning"
  • SP 61. ... "SNiP 41-03-2003 Thermal insulation of equipment and pipelines"
  • SP 62. ... "SNiP 42-01-2002 Gas distribution systems"
  • SP 63. ... SNiP 52-01-2003 Concrete and reinforced concrete structures. Basic provisions "
  • SP 64. ... "SNiP II-25-80 Wooden structures"
  • SP 66. ... "Design and construction of pressure head networks for water supply and sewerage using high-strength pipes made of nodular cast iron"
  • SP 68. ... SNiP 3.01.04-87 Acceptance of completed construction projects for operation. Basic provisions "
  • SP 69. ... "SNiP 3.02.03-84 Underground mine workings"
  • SP 70. ... "SNiP 3.03.01-87 Bearing and enclosing structures"
  • SP 71. ... "SNiP 3.04.01-87 Insulating and finishing coatings"
  • SP 72. ... "SNiP 3.04.03-85 Protection of building structures and structures from corrosion"
  • SP 73. ... "SNiP 3.05.01-85 Internal sanitary systems"
  • SP 74. ... "SNiP 3.05.03-85 Heating networks"
  • SP 75. ... "SNiP 3.05.05-84 Process equipment and process pipelines"
  • SP 76. ... "SNiP 3.05.06-85 Electrical devices"
  • SP 77. ... "SNiP 3.05.07-85 Automation Systems"
  • SP 78. ... "SNiP 3.06.03-85 Highways"
  • SP 79. ... SNiP 3.06.07-86 Bridges and pipes. Inspection and Test Rules "
  • SP 80. ... "SNiP 3.07.01-85 River hydraulic structures"
  • SP 81. ... "SNiP 3.07.03-85 * Reclamation systems and structures"
  • SP 82. ... "SNiP III-10-75 Land improvement"
  • SP 83. ... "SNiP III-24-75 Industrial furnaces and brick pipes"
  • SP 84. ... "SNiP III-39-76 Tramways"
  • SP 85. ... "SNiP III-41-76 Contact networks of electrified transport"
  • SP 86. ... "SNiP III-42-80 * Trunk pipelines"
  • SP 87. ... SNiP III-44-77 Railway tunnels, road and hydraulic tunnels. Subways "
  • SP 88. ... "SNiP II-11-77 * Protective structures of civil defense"
  • SP 89. ... "SNiP II-35-76 Boiler Plants"
  • SP 90. ... "SNiP II-58-75 Thermal Power Plants"
  • SP 91. ... "SNiP II-94-80 Underground mine workings"
  • SP 92. ... "SNiP II-108-78 Warehouses of dry mineral fertilizers and chemical plant protection products"
  • SP 93. ... "SNiP 2.01.54-84 Protective structures of civil defense in underground mine workings"
  • SP 94. ... "SNiP 2.01.57-85 Adaptation of utility facilities for sanitary treatment of people, special treatment of clothing and rolling stock of vehicles"
  • SP 95. ... "SNiP 2.03.02-86 Concrete and reinforced concrete structures made of dense silicate concrete"
  • SP 96. ... "SNiP 2.03.03-85 Reinforced cement structures"
  • SP 97. ... "SNiP 2.03.09-85 Asbestos-cement structures"
  • SP 98. ... "SNiP 2.05.09-90 Tram and trolleybus lines"
  • SP 99. ... "SNiP 2.05.11-83 On-farm highways in collective farms, state farms and other agricultural enterprises and organizations"
  • SP 100. ... "SNiP 2.06.03-85 Reclamation systems and structures"
  • SP 101. ... "SNiP 2.06.07-87 Retaining walls, shipping locks, fish passages and fish protection structures"
  • SP 102. ... "SNiP 2.06.09-84 Hydraulic tunnels"
  • SP 103. ... "SNiP 2.06.14-85 Protection of mine workings from underground and surface waters"
  • SP 104. ... "SNiP 2.06.15-85 Engineering protection of the territory from flooding and flooding"
  • SP 105. ... "SNiP 2.10.02-84 Buildings and premises for storage and processing of agricultural products"
  • SP 106. ... "SNiP 2.10.03-84 Livestock, poultry and fur farming buildings and premises"
  • SP 107. ... "SNiP 2.10.04-85 Greenhouses and hotbeds"
  • SP 108. ... "SNiP 2.10.05-85 Enterprises, buildings and structures for the storage and processing of grain"
  • SP 109. ... "SNiP 2.11.02-87 Refrigerators"
  • SP 110. ... "SNiP 2.11.03-93 Warehouses of oil and oil products. Fire safety standards "
  • SP 111. ... "SNiP 11-04-2003 Instruction on the procedure for the development, coordination, examination and approval of urban planning documentation"
  • SP 112. ... "SNiP 21-01-97 * Fire safety of buildings and structures"
  • SP 113. ... "SNiP 21-02-99 * Parking lots"
  • SP 114. ... SNiP 21-03-2003 Warehouses of forest materials. Fire safety standards "
  • SP 115. ... "SNiP 22-01-95 Geophysics of Hazardous Natural Impacts"
  • SP 116. ... "SNiP 22-02-2003 Engineering protection of territories, buildings and structures from dangerous geological processes. Basic provisions "
  • SP 118. ... "SNiP 31-06-2009 Public buildings and structures"
  • SP 119. ... "SNiP 32-01-95 1520 mm gauge railways"
  • SP 120. ... "SNiP 32-02-2003 Subways"
  • SP 121. ... "SNiP 32-03-96 Aerodromes"
  • SP 122. ... "SNiP 32-04-97 Railway and road tunnels"
  • SP 123. ... "SNiP 34-02-99 Underground storage facilities for gas, oil and products of their processing"
  • SP 124. ... "SNiP 41-02-2003 Heating networks"
  • SP 125. ... "SNiP 2.05.13-90 Oil product pipelines laid on the territory of cities and other settlements"
  • SP 126. ... "SNiP 3.01.03-84 Geodetic works in construction"
  • SP 127. ... SNiP 2.01.28-85 Landfills for the disposal and disposal of toxic industrial waste. Basic provisions for design "
  • SP 128. ... "SNiP 2.03.06-85 Aluminum structures"
  • SP 129. ... "SNiP 3.05.04-85 * External networks and water supply and sewerage facilities"
  • SP 130. ... "SNiP 3.09.01-85 Production of prefabricated reinforced concrete structures and products"
  • SP 131. ... "SNiP 23-01-99 * Construction climatology"
  • SP 132. ... “Ensuring anti-terrorist security of buildings and structures. General design requirements Except sections 1, 7, 8. "
  • SP 133. ... “Networks of wire radio broadcasting and notification in buildings and structures. Design standards "
  • SP 134. ... "Telecommunication systems of buildings and structures. Basic principles of design "
  • SP 136. ... “Buildings and structures. General provisions of design, taking into account accessibility for people with limited mobility "
  • SP 137. ... “Living environment with planning elements accessible to disabled people. Design rules "
  • SP 138. ... “Public buildings and structures accessible to people with limited mobility. Design rules "
  • SP 139. ... “Buildings and premises with work places for disabled people. Design rules "
  • SP 140. ... “Urban environment. Design rules for people with limited mobility "
  • SP 141. ... “Institutions of social services for people with limited mobility. Calculation and placement rules "
  • SP 142. ... “Buildings of resocialization centers. Design rules "
  • SP 143. ... “Premises for leisure and physical culture and recreation activities of people with limited mobility. Design rules "
  • SP 144. ... "Centers and departments of geriatric services. Design rules "
  • SP 145. ... “Boarding houses. Design rules "
  • SP 146. ... “Gerontological centers, nursing homes, hospices. Design rules "
  • SP 147. ... “Buildings for social service institutions. Reconstruction rules "
  • SP 148. ... “Premises in institutions of social and medical services. Design rules "
  • SP 149. ... “Rehabilitation centers for children and adolescents with disabilities. Design rules "
  • SP 150. ... “Boarding homes for disabled children. Design rules "
  • SP 151. ... "Engineering surveys for the placement, design and construction of nuclear power plants (in 2 parts)"
  • SP 152. ... “Buildings of federal courts. Design rules (old: Buildings of courts of general jurisdiction. Design rules) "
  • SP 158. ... “Buildings and premises of medical organizations. Design rules "
  • SP 159. ... “Steel-reinforced concrete spans of road bridges. Calculation rules "
  • SP 160. ... “Buildings and complexes are multifunctional. Design rules "
  • SP 163. ... “Structures using gypsum plasterboard and gypsum fiber sheets. Design and installation rules "
  • SP 164. ... “Reinforcement of reinforced concrete structures with composite materials. Design rules "
  • SP 165. ... "SNiP 2.01.51-90 Engineering and technical measures for civil defense"
  • SP 228. ... “Buildings and structures of the investigating authorities. Design rules "
  • SP 229. ... “Reinforced concrete structures of underground structures and communications. Corrosion protection"
  • SP 230. ... "Structures enclosing buildings. Characteristics of thermal engineering inhomogeneities "
  • SP 242. ... “Buildings of territorial bodies of the Pension Fund of the Russian Federation. Design rules "
  • SP 245. ... “Corrosion protection of linear objects and structures in the oil and gas complex. Rules for the production and acceptance of works "
  • SP 246. ... "Regulations on designer supervision over the construction of buildings and structures"
  • SP 247. ... “Investigation facilities of the penal system. Design rules "
  • SP 248. ... “Underground structures. Design rules "
  • SP 249. ... “Underground communications. Design and construction in closed and open ways "
  • SP 250. ... “Buildings and structures. Protection against groundwater "
  • SP 251. ... “Buildings of educational institutions. Design rules "
  • SP 252. ... “Buildings of preschool educational organizations. Design rules "
  • SP 253. ... "Engineering systems of high-rise buildings"
  • SP 254. ... “Buildings and territories. Industrial noise protection design rules "
  • SP 255. ... “Buildings and structures. Operating rules. Basic provisions "
  • SP 256. ... "Electrical installations of residential and public buildings. Design and installation rules "
  • SP 257. ... “Buildings of hotels. Design rules "
  • SP 259. ... “Bridges in the conditions of dense urban development. Design rules "
  • SP 260. ... “Thin-walled steel structures made of cold-formed galvanized profiles and corrugated sheets. Design rules "
  • SP 261. ... “Railway track of industrial transport. Design and construction rules "
  • SP 262. ... “Container platforms and terminal devices at industrial and transport enterprises. Design and construction rules "
  • SP 263. ... “Adaptation of subways for civil defense protective structures. General design rules "
  • SP 264. ... "SNiP 2.01.53-84 Light camouflage of settlements and objects of the national economy"
  • SP 265. ... “Communication collectors. Design and construction rules "
  • SP 266. ... “Steel-reinforced concrete structures. Design rules "
  • SP 267. ... “High-rise buildings and complexes. Design rules "
  • SP 268. ... “Transport facilities in seismic areas. Design rules "
  • SP 269. ... “Transport facilities in seismic areas. Rules for specifying the initial seismicity and seismic microzoning "
  • SP 270. ... “Transport facilities in seismic regions. Rules for assessing road damage during earthquakes in remote and hard-to-reach areas "
  • SP 271. ... "Noise suppression systems for air heating, ventilation and air conditioning. Design rules "
  • SP 272. ... “Urban and settlement sewerage systems. Inspection rules "
  • SP 273. ... “Water supply and sewerage. Rules for the design and production of work for the restoration of pipelines with flexible polymer sleeves "
  • SP 274. ... “Bridges. Technical condition monitoring "
  • SP 275. ... “Fencing structures for residential and public buildings. Soundproofing design rules "
  • SP 276. ... “Buildings and territories. Design rules for protection against traffic noise "
  • SP 277. ... “Marine coastal protection structures. Design rules "
  • SP 278. ... “Buildings of educational institutions of higher education. Design rules "
  • SP 279. ... “Buildings of professional educational organizations. Design rules "
  • SP 280. ... "Systems of air supply for combustion and removal of combustion products for heat generators on gas fuel. Design rules and devices "
  • SP 281. ... “Heat generating units with a capacity of up to 360 kW, integrated into buildings. Design rules and devices "
  • SP 282. ... “Apartment heating systems based on individual gas heat generators. Design rules and devices "
  • SP 283. ... “Construction objects of increased responsibility. Seismic microzoning rules "
  • SP 284. ... “Field pipelines for oil and gas. Rules for the design and production of work "
  • SP 285. ... “Football stadiums. Design rules "
  • SP 286. ... “Construction objects of increased responsibility. Rules for detailed seismic zoning "
  • SP 287. ... “Marine berthing facilities. Design and construction rules "
  • SP 288. ... “Forest roads. Design and construction rules "
  • SP 289. ... “Constructions of livestock, poultry and fur farming enterprises. Design rules "
  • SP 290. ... "Water throughput hydraulic structures (spillway, water drainage and water outlet). Design rules "
  • SP 291. ... "Reinforced soil-cement structures. Design rules "
  • SP 292. ... “Buildings and structures in tsunami-prone areas. Design rules "
  • SP 293. ... “Systems for facade heat-insulating composite with external plaster layers. Rules for the design and production of work "
  • SP 294. ... “Steel structures. Design rules "
  • SP 295. ... “Concrete structures reinforced with polymer composite reinforcement. Design rules "
  • SP 296. ... “Buildings and structures. Special effects "
  • SP 297. ... "Fiber-concrete structures with non-metallic fiber. Design rules "
  • SP 298. ... "Ventilation systems for road tunnels. Design rules "
  • SP 299. ... “Wooden constructions with knots on screws. Design rules "
  • SP 300. ... “Systems of jet ventilation and smoke removal of underground and covered parking lots. Design rules "
  • SP 301. ... "Information modeling in construction. Rules for the organization of work by production and technical departments "
  • SP 302. ... “Warehouses for emergency chemically hazardous substances. Design rules "
  • SP 303. ... “Buildings of one-story industrial enterprises. Operating rules "
  • SP 304. ... “Structures of large-span buildings and structures. Operating rules "
  • SP 305. ... “Buildings and structures. Rules for conducting geotechnical monitoring during construction "
  • SP 306. ... “Multifunctional shopping malls. Operating rules "
  • SP 307. ... “Buildings and premises for storage and processing of agricultural products. Operating rules "
  • SP 308. ... "Correctional institutions and centers of the penal system. Design rules "
  • SP 309. ... “Theatrical and entertainment buildings. Design rules "
  • SP 310. ... “Swimming Pools. Design rules "
  • SP 311. ... “Concrete and reinforced concrete structures made of high-strength concrete. Design rules "
  • SP 312. ... “On-farm roads. Operating rules "
  • SP 313. ... “Automobile roads in permafrost regions. Design and construction rules "
  • SP 314. ... “Crane ground rail tracks. Design, device and operation "
  • SP 315. ... "Channelless heating networks. Design rules "
  • SP 316. ... “Container terminals. Design rules "
  • SP 317. ... "Engineering and geodetic surveys for construction. General rules for the production of work "
  • SP 318. ... “Forest roads. Operating rules "
  • SP 319. ... “Buildings and premises of medical organizations. Operating rules "
  • SP 320. ... “Landfills for solid household waste. Design, operation and reclamation "
  • SP 321. ... “Residential and public buildings. Radon protection design rules "
  • SP 322. ... “Buildings and structures in seismic areas. Earthquake Consequences Inspection Rules "
  • SP 323. ... “Residential territories. Outdoor lighting design rules "
  • SP 324. ... “Buildings of multi-storey industrial enterprises. Operating rules "
  • SP 325. ... “Buildings and structures. Work rules for dismantling and disposal "
  • SP 327. ... “External walls with a facing brick layer. Design, operation and repair rules "
  • SP 328. ... “Information modeling in construction. Rules for describing information model components "
  • SP 329. ... “Buildings and structures. Post-fire inspection rules "
  • SP 330. ... “Buildings and structures in seismic areas. Design rules for engineering seismometric stations "
  • SP 331. ... "Information modeling in construction. Exchange rules between information models of objects and models used in software systems "
  • SP 332. ... “Sports facilities. Design rules "
  • SP 333. ... "Information modeling in construction. Rules for the formation of an information model of objects at various stages of the life cycle "
  • SP 334. ... "Apartment heating points in multi-apartment residential buildings. Design rules "
  • SP 335. ... “Large-panel structural systems. Design rules "
  • SP 336. ... "Ventilation and air conditioning systems. Operating rules "
  • SP 337. ... “Reinforced concrete precast-monolithic structures. Design rules "
  • SP 338. ... “Noise protection for high-speed railway lines. Design and construction rules "
  • SP 339. ... "Structures made of cellular concrete. Design rules "
  • SP 340. ... “Reinforced concrete and concrete cooling towers. Design rules "
  • SP 341. ... “Underground engineering communications. Laying by horizontal directional drilling "
  • SP 342. ... "Protection of railway tracks and structures from adverse natural phenomena. Design and construction rules "
  • SP 343. ... “Constructions of industrial enterprises. Operating rules "
  • SP 344. ... "Internal water supply and heating systems for buildings using pipes made of" cross-linked "polyethylene. Design and installation rules "
  • SP 345. ... “Residential and public buildings. Thermal protection design rules "
  • SP 346. ... “Systems of gas-air ducts of boiler plants with a capacity of up to 150 MW. Design rules "
  • SP 347. ... "Internal heating systems, hot and cold water supply. Operating rules "
  • SP 348. ... “Industrial parks and industrial clusters. Design rules "
  • SP 349. ... “Concrete and reinforced concrete structures. Repair and strengthening rules "
  • SP 351. ... “Concrete and reinforced concrete structures from lightweight concrete. Design rules "
  • SP 352. ... "Single-family residential buildings with a wooden frame. Design and construction rules "
  • SP 353. ... "Protection against noise of subway objects. Design, construction and operation rules "
  • SP 354. ... "Foundations of bridge supports in areas of permafrost. Design and construction rules "
  • SP 355. ... "Frame structures of reinforced concrete prefabricated one-storey buildings for industrial purposes. Design rules "
  • SP 356. ... “Prefabricated reinforced concrete frame structures for multi-storey buildings. Design rules "
  • SP 357. ... “Concrete structures of hydraulic structures. Rules for the production and acceptance of works "
  • SP 358. ... "Hydraulic structures. Design and construction rules in seismic areas "
  • SP 359. ... “Steel vertical cylindrical silos for storage of bulk products. Design rules "
  • SP 360. ... “Structures are steel fiber concrete. Design rules "
  • SP 361. ... “Buildings and structures. Protective measures in the zone of influence of the construction of underground facilities "
  • SP 362. ... "Fencing structures made of three-layer panels. Design rules "
  • SP 363. ... “Translucent coatings and lamps of buildings and structures. Design rules "
  • SP 365. ... “Vertical cylindrical steel tanks for storage of petroleum products. Rules for production and acceptance of works during installation "
  • SP 366. ... "Field pipelines. Assessment of technical solutions based on risk analysis "