Portal about bathroom renovation. Useful tips

Frame house 6 8 with garage. Do-it-yourself frame house projects with a garage: construction technologies, diagrams and advantages

A house and a garage in a single complex provide clear advantages over two separate buildings.

  • First of all, it is a lower construction cost.
  • Saving site area, compact structure.
  • It is much easier and cheaper to install heating in such a garage.
  • Possibility of access to the garage directly from home, convenience of technical rooms.

For obvious reasons, the cost of a frame house with a garage is significantly lower than the price of two separate buildings. Savings come from adjacent walls, a common foundation and a simpler roof structure. The entire building turns out to be compact, and this is clearly visible in the photos of such objects. In Moscow, construction sites are never too large, and saving space will not be superfluous.

It is much easier to install heating and lighting in a garage shared with the house. At the same time, less fuel will be spent on heating the garage, since it is enclosed in a common insulation circuit. Often, projects of such cottages provide an additional entrance to the garage directly from the living quarters, which is not only convenient, but also contributes to overall safety.

Why frame?

Frame technology has a number of advantages over traditional construction. First of all, a frame house with a garage will cost less than one made of brick, blocks, etc.

There are several savings here:

  • use of lightweight columnar or pile foundations;
  • relatively low material consumption of construction;
  • low transport costs and costs lifting equipment;
  • savings on labor costs and short construction times.

The technology itself involves completing a set of works in the shortest possible time. In this case, turnkey construction does not misfire and eliminates the emergence of long-term construction projects. Frame houses with a turnkey garage are completely finished buildings that do not require insulation or finishing. IN frame walls Insulation is immediately laid, and the internal and external cladding is designed so as to create optimal temperature and humidity conditions in the walls themselves.

Cottages with a garage from SK-Posad

The SK-Posad company offers the design and construction of frame cottages in Pestovo and the Moscow region. You can order the creation of houses with a wide variety of configurations from us. Projects and prices of cottages are posted on the website. Each project can be assessed both by its appearance and by its floor plans, which give a good idea of ​​the building's layout.

We provide a range of services related to the construction of frame houses, from design to commissioning of the facility. From us you can choose a preliminary design, an architectural design, designs of individual engineering systems or a complete set of documentation, which takes into account all the details of the upcoming construction. In any case, we guarantee high quality our services.

Projects one-story houses with a garage are extremely popular today. Russians increasingly prefer this housing model. Houses with a garage are a real godsend: it’s so convenient in the autumn-winter to put the car in a heated room, finding yourself practically immediately warm. This will make your life even more comfortable.

Take advantage of the advantages of such houses - order project development from professionals! We make projects of frame houses with a garage quickly and efficiently.

House designs and features of buildings with a garage

Such housing is distinguished by its simplicity of design, good layout and large enough area for the average family. By choosing a one-story option with a garage, you get a lot of advantages:

  • wide planning possibilities;
  • low cost of construction, which characterizes frame houses; IN
  • warm, spacious housing;
  • reliable and free car storage.

This type of house has a compact and functional layout. You always have quick access to the garage area, which is especially important in bad weather. This layout of the premises on one level creates a certain comfort in their use.

Thoughtful designs of houses with a garage allow you to very economically manage the territory of even a small plot. Dachny Sezon specialists will help you choose the most optimal layout based on your preferences and budget. In addition, house projects with such a solution will cost much less than the construction of a separate building for parking a car.

The catalog contains a huge number of project options. All of them are distinguished by a functional, well-thought-out layout, good heat and sound insulation, environmentally friendly materials and affordable prices. When choosing a project in combination with a garage space, special attention should be paid to the presence of a vestibule, which will prevent unwanted odors from entering the living area. The vestibule will create an additional air layer that retains heat.

The garage must be spacious, and house designs must take this into account: you must comfortably get into and out of the car, opening the doors freely and without damaging their coating. Among other things, the garage allows you to successfully place boiler equipment for cottages without taking up useful space inside. But the main advantage of such a “neighborhood” is secure storage of the car and, consequently, your peace of mind. Designing frame houses with a garage is a job for our professionals!

On our website you can also see a variety of design solutions for houses with a garage. Projects of two-story houses with a garage are best suited for the comfortable life of a large family. Choose a frame house to create quality conditions!

Projects of frame houses with a garage are in high demand among private developers. After all, according to financial costs and labor intensity, such projects are the most economical, and the presence of a parking space significantly increases the level of comfort. For example, a one-story frame cottage with a garage will cost 1.5-2 times less than a brick cottage of the same size.

Features of frame buildings

The principle of frame technology is that a post-and-beam structure is erected from wood, and the walls are filled with economical thermal insulation materials. Modern multi-layer frame structure. The basis of the walls is a wooden frame, on which both sides are covered with cladding (DSP, chipboard, OSB or wood) and insulation.

Advantages of frame house construction:

  • A small one does not require a massive foundation, usually a cheap columnar one is sufficient. In the case of a two-story building, you need.
  • Using wood as the main material for construction reduces the load on the foundation. However, fire safety problems arise for the building.
  • It is possible to use any type of heating, but taking into account fire safety. Helps reduce the risk of fire treatment of wooden parts with special substances - fire retardants, increasing fire retardant properties. Non-combustible materials should be used as thermal insulation.
  • Frame houses with an extension are practically not subject to shrinkage, so you can immediately begin finishing the external and internal walls. Most often, siding, plaster or lining is chosen for external finishing.

They try not to use a cement screed in such houses so as not to increase the load on the foundation. In addition, good insulation of wooden structures from wet processes is necessary.

At any stage of operation, you can make a residential or commercial extension to a frame house with your own hands, expanding the area and capabilities of the building.

Projects of frame houses with a garage

If you are just planning to build a frame house, then immediately choose a project with a garage, even if the family does not yet have a car. This is much more profitable than later building a garage separately or attaching it to a previously built house. IN general structure It’s easier to organize heating, lighting and ventilation in the garage.

How to attach a garage to a house

Adding a garage to an existing house is possible in the following ways:

  • Organization of an entrance from the street without the possibility of entering the garage from the main building. This is the safest way, but in this case you will have to give up some convenience.
  • An extension, which is supposed to be entered from both the street and the house. In this case, at the entrance from the main building, there should be an organized ventilated vestibule, which will protect the house from noise and exhaust gases.
  • Construction of a carport for parking a car. Sufficient protection from precipitation, saving money and area. It is better if there is a wall covering the parking space from the side of precipitation.

The minimum pressure on the ground allows you to attach a garage to a frame house in close proximity without the risk of subsidence and deformation of the base. The foundation for the extension does not have to be the same as that of the main building. For small garages, a columnar or strip foundation is most often chosen. Walls can be erected using the same frame technology. An equally popular option is walls made of foam blocks.

Advantages and disadvantages of a wooden garage

A garage made of timber or other wooden material is rare. But if we are talking about building a garage and a frame house with your own hands, this option is quite acceptable.

A wooden extension has the following positive properties:

  • affordable price;
  • possibility of building with your own hands;
  • durability;
  • the ability to attach to any building, it does not have to be a frame house;
  • low operating costs;
  • environmental friendliness of the material (wood);
  • For a wooden garage, the simplest one is suitable - a columnar one.

However, wooden buildings also have significant shortcomings:

  • the risk of fire is higher than in other types of houses;
  • wood absorbs moisture; if ventilation is poor, this can cause mold;
  • poor sound insulation of walls and ceilings;
  • attractive to rodents and pests.

Pros and cons of building a garage from foam blocks

The most popular material, which is most often chosen by private developers for extensions to a cottage, is foam blocks. To build a garage from foam blocks with your own hands, you do not need special equipment or experience in construction. In addition, the cost of a block structure is often lower than the cost of construction from other materials.

There are many advantages to adding a garage made of foam blocks:

  • ease of installation;
  • high-quality sound insulation;
  • fire resistance;
  • excellent thermal insulation properties;
  • environmental friendliness (in second place after wood);
  • ease of drilling and processing;
  • rot resistance.

In addition, it is important to know what disadvantages are typical for a garage made of foam blocks:

  • Fragility. On the one hand, due to its fragility, the block can be easily processed, on the other hand, this can lead to cracks.
  • An extension made of foam blocks shrinks by 2-3 mm per meter, so you will have to wait at least six months for finishing.
  • High water absorption of foam blocks.

A frame house with a garage and an attic made of wooden materials is more appropriate than one made of foam blocks. Such a building has a more harmonious appearance, although the difference can always be hidden with external decoration.

DIY frame garage construction

Examples of frame houses with a garage can easily be found on the Internet. The main question is how to properly build such a structure.

Construction stages

The main and attached buildings transmit different loads on the ground, as a result of which the buildings can shift relative to each other. It follows from this that the attachment of the extension to the wall of the main building should not be rigid. For this, an expansion joint is provided, which, roughly speaking, is the gap between the house and the garage.

In the construction of an extension with your own hands the following stages are distinguished:

  1. Preparing the base.
  2. Construction of the foundation.
  3. Roof installation.
  4. Frame covering.
  5. Gate installation.
  6. Interior decoration.

Preparing the base and pouring the foundation

First of all, it is necessary to remove the plant layer of soil (about 15 cm). Then the site for the construction of a frame garage is leveled and laid out. The main task of laying out the foundation is to determine the location of the axes of the structure being added. Wooden stakes are usually used to secure the axles to the ground.

Next, a pit is dug according to the shape of the foundation, a mixture of sand and gravel is poured onto the bottom, and then a layer of rubble is poured. The minimum height of the layer of sand and gravel cushion and rubble is 15 cm, but not more than 25 cm. For the foundation of an extension to a house, a depth of up to 60 cm is sufficient.

Formwork is installed around the perimeter of the foundation pit dug. Then from reinforcing bars the frame is formed and the concrete solution is poured.

After the foundation is built, the piping is done. The bottom frame of the extension is made from boards 100x50 millimeters. For garage doors and corner posts, you can use timber with a section of 100x100 millimeters. Vertical racks are installed in 60 cm increments, which avoids difficulties when laying insulation. The pitch of the rafters and floor joists is also taken to be 60 cm. The upper trim is performed in the same way as the lower one.

Roof structure

For the roof of an extension to a house, boards of 100x25 millimeters are suitable. A mauerlat is supported on the outer wall, to which the rafters are attached. Then the waterproofing is laid and the sheathing is installed on top of it.

When laying rafters, you need to make a joint between the roof of the existing house and the roof of the garage. To do this, the rafters of the extension are attached to the roof truss system of the previously constructed building.

To cover the roof when building an extension with your own hands, you should use flexible materials (corrugated sheeting with a section height of less than 10 mm, soft tiles).

Frame covering

Any frame structure must be securely protect from moisture. For cladding, sheet materials, siding, clapboard or edged boards are used. Ideally, you need to buy the same material as for the facade of the house.

Gate installation

Most often, swing double-leaf gates are chosen for a wooden frame garage. To save space and convenience, you can install lift-type gates. For example, automatic sectional or overhead gates.

Interior decoration

The most common option used to decorate the inside of garage walls is plasterboard sheathing. Suitable here GKLVO– moisture-resistant plasterboard sheets with fire protection. They can be recognized by their gray-green color and red markings.

Plasterboard walls can be finished with any suitable material, for example, plastered with decorative compounds or painted.

Video: technology for constructing a frame garage

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, and a solution was proposed to move the terrace.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tiles.
    external finishing: the walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, manufactured locally, based on technical specifications visualization, painted. The base is lined with decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as the basis. False beams were installed on the ceilings.
    additionally: a fireplace has been installed and finished.

    What was done

    This is the very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready-made Project for his future home! Our team liked the project - after all, such unusual and stylish solutions are always a professional challenge!
    We prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! The frame house is made using our proven Canadian technology with 200 mm insulation along the entire contour! The outside of the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to professional painting of imitation timber and selection of paints.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge, building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory ones - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, this was precisely the difficult task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be built in a short time on the existing foundation. Dmitry and his family had a desire to build a new house in the high-tech style. After careful measurements, a design was made that took into account the old layout, but had a new modern form with interesting innovations! The house now has an entrance lobby where you can sit at a table on cozy evenings and a complex but possible in our area exploitable roof. To implement such a roof, we called upon our knowledge and modern building materials, LVL beams, fused roofing and much more. Now in the summer you can have an unusual dinner on such a roof or watch the stars at night! In the decoration, our architect also emphasized the minimalistic and graphic high-tech style. Smooth plastered walls with painted plank details, and wooden beams at the entrance added personality. The inside of the house is decorated with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the site created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the section of country architecture in the high-tech style, a style chosen by brave Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for living that will fit perfectly into their difficult narrow plot! With the advent of children, it was decided to make the dream come true; children grow up quickly and in their own home in nature there are many opportunities and fresh air. We, in turn, were glad to work on an individual project for a house in a classic style made of red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, storage of materials on site, get acquainted with the construction team, and make sure the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, masonry with mortar??? Windows have been installed.
    roof: metal tile
    terrace: rough fencing elements have been completed, flooring has been installed.

    What was done

    Dmitry contacted our company with an interesting preliminary design to calculate the cost. Our experience allows us to perform such calculations based on preliminary designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team began to carry out a complex and expressive country project with spacious premises and a garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work at the same high level! Since the object is large, Dmitry proposed stage-by-stage cooperation, namely upon successful completion foundation works, we started the second part of the project - walls + floors + roof. Also, the exact timing of construction was important for Dmitry; in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was delivered right on time! The result pleased us and the Customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, which benefited all participants in the process!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer’s family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect’s calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden on wooden beams, in places of large spans installation of LVL beams. Basement ceiling insulated basalt insulation in 200mm; interfloor ceiling with 150mm sound insulation.
    box: box: walls made of expanded clay concrete blocks, masonry with mortar. Windows have been installed.
    roofing: installation of metal tiles.
    external finishing: the facade is insulated with basalt facade slabs 100 mm, facades are covered with facing bricks; the color scheme was proposed by the architect and agreed with the Customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family to live in!
    Olga and other family members went from idea to implementation in several stages! Choosing a technology, working on a project for a long time, building a foundation, building a house with exterior finishing and then working on interior decoration! Frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They were pleased with the quality of work on our construction site and the workers who gave us a detailed tour! We also spent a long time working on the estimate, combining different finishing options and comparing their costs. This allowed us to choose the best option from a wide variety finishing materials and complete sets.
    The project was created by an architect friend, but we had to work out the constructive part of it. After which the most reliable and effective foundation- USHP. Next, work began on the box. A frame house with 200 mm insulation along the entire contour and a unique roof insulation technology of 300 mm. For the exterior decoration, siding was chosen in a spectacular combination of colors - coffee and cream. Accents are placed thanks to powerful roof overhangs, an interfloor belt and large windows!

    What was done

    When you decide to become the happy owner of your own home and move to a new home for permanent residence, first of all you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander came to our company with the desire to move to his own country house. He liked the Avignon project and there was already a strip foundation on the site. After the initial visit to the site, measurements and inspection of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the size of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received a gift of reinforced concrete floors, one of the leading construction teams and a house according to the design he liked, which stood on a plot with exterior finishing by spring! Alexander observed every stage of construction, regularly visiting the construction site and was pleased with the result, and we were pleased with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding finishing!

    What was done

    Each house is a separate story of creation and implementation! One day we built a house good people and they recommended us to another good person! Andrey Rumyantsev came to our company with the desire to build a one-story spacious country house with a fireplace for warm family evenings on the site of an old country house... It was decided to build the house from aerated concrete blocks so that the future handsome country man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick - can easily be called the best solution in the field of stone housing construction - warm, affordable, beautiful, reliable. Modern technologies have advanced so much that such unique configurations become available in a short time, because we built this project over the winter months. The main thing is to have the necessary knowledge and constantly replenish it!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer’s family; a terrace and patio were proposed, taking into account the cardinal directions on the Customer’s site.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-and-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a 150 mm sound insulation device.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tiles.
    Exterior finishing: the walls are insulated with basalt facade insulation and plastered. Based on the visualization, facade panels under the Tolento stone were added. The enclosing elements of the terrace and balcony are made of wood, made locally, based on technical specifications visualization, and painted. The roof overhangs are lined with soffits matching the color of the roof.

    Vladimir Murashkin,

    The owner of a house “brought to life according to his idea and sketch!”

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas future home, we light up doubly! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot of land with picturesque views of the Oka bank! This view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, oriented towards beauty, became an indispensable attribute of the future house! Vladimir wanted to relax in nature in a wooden house, but it was necessary to build a house in a short time and the ideal solution for such problems was frame technology construction! If we’re going to be different, it’s in everything! The house was made even more spectacular by the vertical finishing of imitation timber made of durable larch, painted in natural shades with emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be an excellent country house, with highlights and at the same time incredibly functional.

    It all started with an individual project found by the Customer’s family on a European website. It was with him that she came to our office for the first time. We made preliminary calculations for the project, took a tour of the existing construction site, shook hands and work began to boil! The architect improved and adapted the project to the site and the Client’s family; the foreman “planted” the house on the site. Based on geological surveys, it was decided to place the house on bored piles. The frame grew in a few weeks, then the roofing, insulation, exterior finishing! Behind winter period a house grew on the site. The customer invited a third-party technical supervisor who monitored the process independently of our multi-stage control. The color scheme for painting the imitation timber was selected by our manager and here in front of us is the bright and cozy country house of the Pushkov family’s dreams!

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, and a solution was proposed to move the terrace.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tiles.
    external finishing: the walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, manufactured locally, based on technical specifications visualization, painted. The base is lined with decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as the basis. False beams were installed on the ceilings.
    additionally: a fireplace has been installed and finished.

    What was done

    This is the very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready-made Project for his future home! Our team liked the project - after all, such unusual and stylish solutions are always a professional challenge!
    We prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! The frame house is made using our proven Canadian technology with 200 mm insulation along the entire contour! The outside of the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to professional painting of imitation timber and selection of paints.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge, building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory ones - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, this was precisely the difficult task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be built in a short time on the existing foundation. Dmitry and his family had a desire to build a new house in the high-tech style. After careful measurements, a design was made that took into account the old layout, but had a new modern form with interesting innovations! The house now has an entrance lobby where you can sit at a table on cozy evenings and a complex but possible in our area exploitable roof. To implement such a roof, we called upon our knowledge and modern building materials, LVL beams, fused roofing and much more. Now in the summer you can have an unusual dinner on such a roof or watch the stars at night! In the decoration, our architect also emphasized the minimalistic and graphic high-tech style. Smooth plastered walls with painted plank details, and wooden beams at the entrance added personality. The inside of the house is decorated with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the site created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the section of country architecture in the high-tech style, a style chosen by brave Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for living that will fit perfectly into their difficult narrow plot! With the advent of children, it was decided to make the dream come true; children grow up quickly and in their own home in nature there are many opportunities and fresh air. We, in turn, were glad to work on an individual project for a house in a classic style made of red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, storage of materials on site, get acquainted with the construction team, and make sure the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, masonry with mortar??? Windows have been installed.
    roof: metal tile
    terrace: rough fencing elements have been completed, flooring has been installed.

    What was done

    Dmitry contacted our company with an interesting preliminary design to calculate the cost. Our experience allows us to perform such calculations based on preliminary designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team began to carry out a complex and expressive country project with spacious premises and a garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work at the same high level! Since the object is large, Dmitry proposed stage-by-stage cooperation, namely, upon successful completion of the foundation work, we began the second part of the project - walls + floors + roofing. Also, the exact timing of construction was important for Dmitry; in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was delivered right on time! The result pleased us and the Customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, which benefited all participants in the process!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer’s family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect’s calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden on wooden beams, in places of large spans installation of LVL beams. The basement floor is insulated with 200mm basalt insulation; interfloor ceiling with 150mm sound insulation.
    box: box: walls made of expanded clay concrete blocks, masonry with mortar. Windows have been installed.
    roofing: installation of metal tiles.
    external finishing: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; the color scheme was proposed by the architect and agreed with the Customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family to live in!
    Olga and other family members went from idea to implementation in several stages! Choosing a technology, working on a project for a long time, building a foundation, building a house with exterior finishing and then working on interior decoration! Frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They were pleased with the quality of work on our construction site and the workers who gave us a detailed tour! We also spent a long time working on the estimate, combining different finishing options and comparing their costs. This made it possible to choose the best option from a wide variety of finishing materials and configurations.
    The project was created by an architect friend, but we had to work out the constructive part of it. After which the most reliable and effective foundation was erected - USHP. Next, work began on the box. A frame house with 200 mm insulation along the entire contour and a unique roof insulation technology of 300 mm. For the exterior decoration, siding was chosen in a spectacular combination of colors - coffee and cream. Accents are placed thanks to powerful roof overhangs, an interfloor belt and large windows!

    What was done

    When you decide to become the happy owner of your own home and move to a new home for permanent residence, first of all you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander came to our company with the desire to move to his own country house. He liked the Avignon project and there was already a strip foundation on the site. After the initial visit to the site, measurements and inspection of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the size of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received a gift of reinforced concrete floors, one of the leading construction teams and a house according to the design he liked, which stood on a plot with exterior finishing by spring! Alexander observed every stage of construction, regularly visiting the construction site and was pleased with the result, and we were pleased with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding finishing!

    What was done

    Each house is a separate story of creation and implementation! One day we built a house for good people and they recommended us to another good person! Andrey Rumyantsev came to our company with the desire to build a one-story spacious country house with a fireplace for warm family evenings on the site of an old country house... It was decided to build the house from aerated concrete blocks so that the future handsome country man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick - can easily be called the best solution in the field of stone housing construction - warm, affordable, beautiful, reliable. Modern technologies have advanced so much that such unique configurations become available in a short time, because we built this project over the winter months. The main thing is to have the necessary knowledge and constantly replenish it!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer’s family; a terrace and patio were proposed, taking into account the cardinal directions on the Customer’s site.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-and-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a 150 mm sound insulation device.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tiles.
    Exterior finishing: the walls are insulated with basalt facade insulation and plastered. Based on the visualization, facade panels under the Tolento stone were added. The enclosing elements of the terrace and balcony are made of wood, made locally, based on technical specifications visualization, and painted. The roof overhangs are lined with soffits matching the color of the roof.

    Vladimir Murashkin,

    The owner of a house “brought to life according to his idea and sketch!”

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas for their future home, we become doubly excited! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot of land with picturesque views of the Oka bank! This view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, oriented towards beauty, became an indispensable attribute of the future house! Vladimir wanted to relax in nature in a wooden house, but it was necessary to build a house in a short time, and frame construction technology became the ideal solution for such problems! If we’re going to be different, it’s in everything! The house was made even more spectacular by the vertical finishing of imitation timber made of durable larch, painted in natural shades with emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be an excellent country house, with highlights and at the same time incredibly functional.

    It all started with an individual project found by the Customer’s family on a European website. It was with him that she came to our office for the first time. We made preliminary calculations for the project, took a tour of the existing construction site, shook hands and work began to boil! The architect improved and adapted the project to the site and the Client’s family; the foreman “planted” the house on the site. Based on geological surveys, it was decided to place the house on bored piles. The frame grew in a few weeks, then the roofing, insulation, exterior finishing! Over the winter, a house grew on the site. The customer invited a third-party technical supervisor who monitored the process independently of our multi-stage control. The color scheme for painting the imitation timber was selected by our manager and here in front of us is the bright and cozy country house of the Pushkov family’s dreams!